Hawkstone Estate
Thermal Improvement Works – External Cladding
CLIENT
London Borough of Southwark
DURATION
64 Weeks
VALUE
tbc
CONTRACTOR
British Gas & Lawtech
Blakeney Leigh were retained by London Borough of Southwark to design and manage the external refurbishment of all of Southwark’s Solid wall constructed blocks. A total of 59 blocks were covered in
External Wall Insulation (EWI). All blocks went through a pre-planning process, Blakeney Leigh provided a resident consultation process providing residents with detailed block elevation drawings showing colour options, then a further 8 week planning process was observed before works progressed. A full project management service was provided with detailed snagging of all works carried out.
The following show the difference in U-Values that External Wall Insulation (EWI) creates and how the likelihood of condensation risk is severely reduced.
Services Provided
Building Surveyor
CDM – Principal Designer
Clerk of Works
Employers Agent